VRUNDA CONSULTANCY SERVICES

PRODUCTIVITY FOR PROSPERITY

Case Study


Tool

Planning, Scheduling, BPR, Method Analysis and Multi skilling


Type of Industry

Engineering - Machine Building - MSE


Process

  • Stream lining of Planning processes
  • Improvement in scheduling
  • Development of Multi skilling through on Job Training
  • Identification, Exhaust and removal of Constraints
  • BPR
  • Continuous measurement of Productivity, output, process timings and throughput, initiate corrective actions and measure effectiveness.

Results

Production Enhancement - from 60 Lacs a Month to 200 lacs a Month.

Tool

Time and Motion Study


Type of Industry

Petrochemical ‐ Large Scale


Process

  • Take an inventory of the total process
  • Total process is sub divided in a set of small measurable activities
  • Each activity was measured in terms of Method, Time consumed for various activities and involvement.
  • On conducting a time study we got a range of times for an operation depending on the number of cycles captured.
  • A Lean analysis was carried out for the operation.
  • VA, NVA and required NVAs are identified.
  • Process reengineering was carried out.
  • Improvements on the working methods are done to remove/reduce the identified NVA's
  • Work load balancing is done to maximize the utilization of the workforce and achieve the desired productivity levels

Results

  • Total No of Processes - 185 Processes
  • VA identified - 106 Processes
  • Required NVA identified - 24 Processes
  • NVA identified - 55 Processes
  • Manpower restructuring - Reduction of 20% Manpower from the existing processes, training imparted and place them in other processes.
  • Total cost saving - @192 lace per annum.

Tool

Training - Knowledge and Practical


Type of Industry

Engineering - Rail coach Manufacturing


Subject

Electricals for non electrical


Process

  • 40 Ladies were selected - Basic qualification Std 10 Pass.
  • Class room Training provided on Basics of Electrical Engineering.
  • Total Training Tenure - 120 days
  • Target production per person per day was fixed, Ladies are trained for making panels, wire harness and assembly.
  • Project completed

Results

  • All 40 ladies are absorbed by company.